PROJECTS LIST | Download PDF |
Construction of Six-Lane access-controlled highway (NH-152D) starting from junction with NH-9 (Rohtak-Jind Section) near Kharkara to Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri [ Ch. 131+000 to 165+000; length 34 km] on EPC Mode under Bharatmala Pariyojana in the State of Haryana (Pkg-6) |  |
Construction of Service Road of Master Sector dividing Road of 102A/103, Gurugram, Haryana |  |
Improvement of two number road (i) Strengthening on Mauzabad to Jatauli road from Km. 0.00 to 7.82 Km. (ID 3194) (ii) 30 mm BC on Rohari to Jasat Khor Nanu Kalan to Malakhera from Km. 0.00 to 15.70 in Gurugram District ( Pataudi Constituency) |  |
Improvement & Strengthening of existing road network in Sector - 8 at IMT Manesar |  |
Upgradation of Gulabad to Pingore via Maachipur, Likhi, Elahabad, Ghasera, Kanwarka in Hassanpur Block of Palwal District PMGSY-III Batch-II T-05 |  |
Upgradation of Solpur Kolgaon Road ( Badopur) to Banarsi via Reegarh, Alipur Habitka, Marora, Balai of F P Jhirka Block under PMGSY-III (T-04) Batch-I (Package No. HR 22-III-11) |  |
Improvement of Road by Providing Widening & Strengthening on Hathin to Alawalpur via Lakhnaka, Malai in Palwal District (Under PMGSY-III) Batch-II |  |
Upgradation of Punhana Shikrawa road (Jalika Chowk) to BKP road (Luhinga Kalan) via Sultanpur Ter Pinangwan, Papra, Akbarpur , Gangawani of Punhana Block under PMGSY-III (T-01) BATCH-1.(Package No. HR22-III-03) |  |
Improvement of Road by Providing Widening & Strengthening on Hudithal to Mandkola via Swamika, Gharrot, Puthly and Khokiyaka in Palwal District ( Under PMGSY-III Batch-II) |  |
Upgradation of Jogipur Hathin Road Km. 0 to 7.80 in Nuh Distt. (Road ID 1149) under NABARD RIDF –XXVII Scheme |  |
Improvement of Road by Providing Widening & Strengthening on Kondal to Sevli in Palwal District (Under PMGSY-III) Batch-II |  |